The Mianyang WtE plant has a capacity of 1,000 tonnes per day. Dublix supplied fully automatic DD-Jet systems for water-jet cleaning of both boilers (third boiler pass). The result is improved heat transfer to the boiler and reduced flue gas temperatures. For further details on the DD-Jet system see https://www.dublix.com/solutions/boiler-cleaning.
The commissioning has been been successfully completed by the Dublix staff in China. The DD-Jet system can be operated fully automatically from the control room or from a local control panel in the boiler house. Click on Link for video below with further details on the automatic operation at the Mianyang plant.