The Taiwanese waste incinerator in Pali was commissioned in 2000 3 lines each with air-cooled grates of a capacity of 19 t/h.
The plant is operated by Veolia, Ta-Ho.

 Dublix Engineering provided:

  • Project management
  • Performance test
  • Guarantee period management

Pali

Veolia, Ta-Ho, Pali, 3* 19 t waste/h

Year
2000
Industry
Waste to Energy

23.95866658981, 120.54959532947