The client chose Dublix to provide an operator support system to handle the start-up and shut-down procedures on its two natural gas fired boilers at the SSE Medway Power Station operating as a peak load supplier.

The main purpose of the FuzEvent project was to reduce the risk of plant trips and to release the stress on operators during the critical start-up and shut-down phases when the operators shall carry out many actions within a short time frame.

The FuzEvent system is configured to take the power plant from a cold or worm standby state to full operation in the shorted possible time as requested by the UK national power grid management.   

SSE Medway Power Station

Year
2019
Industry
Biomass

51.456834307054, 0.71383416539835