AffaldPlus Slagelse shall February 2018 install a fully automatic DD-Jet Boiler Cleaning system required for the cleaning on the second pass of its waste to Energy combustion line.
This is the second DD-jet system in the AffaldPlus organization the first system was 2014 installed at the to the plant in Naestved 40 km south of the Slagelse plant.
DD-Jet system for AffaldPlus Slagelse
Year
2018
Industry
Waste to Energy